- Water, sewer, & stormwater
distribution systems
- Erosion Control Plans
- On-Site Sewer Systems, including pump
tanks, Low Pressure Pipe Systems & Drip Irrigation, and a
variety of pretreatment including sand filters, peat
bio-filters, & ATUs
- Water system management plans and
permitting
- Grading & drainage plans
- Watershed analysis, stream & flood
control design
- Road design
- Earthen dam and reinforced concrete dam
design
- Plumbing design for buildings &
structures
|
- Phase I & II Environmental Site
Assessments; remediation planning & design, SPCC plans; SARA
Title III Form R reports
|
Electrical Plan for a
small commercial store Click
Here for Larger photo |
- Single & three phase power &
lighting design
- Primary & secondary power
distribution design for subdivisions
- Load calculations
|
|
- Site QA inspections, submittal review,
claims analysis, expert testimony
|
T.E. ALLEN
ENGINEERING, PC P.O.
Box 103 Rosman, NC
28772 Phone: (828)
877-4883 Email:
tealleneng@citcom.net
|
Webdesign
& Maintenance:R.
Fetrat Copyright
© 2005 Terry Allen Engineering |
[an error occurred while processing this directive] |